As part of the project the construction of 8 km micro tunnel with 1,800 calibers, and the installments of 12 km HDPE pipelines with 600 mm calibers, 9 km L pipelines with 1,800 calibers, and 8,500 m tailrace for wastewater and stormwater are being done.